SR EN 50625-2-4:2018

Collection, logistics & treatment requirements for WEEE - Part 2-4: Treatment requirements for photovoltaic panels

This clause of part 1 is replaced with the following: This European Standard is applicable to the treatment of photovoltaic panels as mentioned in the WEEE Directive under Annex 4. The scope of this document is limited to photovoltaic panels with a minimum surface area of 0,2 m2. This European Standard applies to the treatment of photovoltaic panels until end-of-waste status is fulfilled, or photovoltaic panel fractions are recycled, recovered or disposed. This European Standard addresses all operators involved in the treatment including related handling, sorting and storage of photovoltaic panels. This European Standard applies to all facilities including those whose treatment operations using mobile treatment installation.

26.85

Status : Valid
Approval date : 8/31/2018
Number of pages : 22
ICS : 13.030.99 Other standards related to wastes,27.160 Solar energy engineering
Technical Committee : 19 - Environmental conditions, classification and methods of test; Environmental standardization for electrical and electronic products and systems